Master Plans

The Engineering Department provides the city's infrastructure master plans (water, wastewater, storm drainage) which prioritize infrastructure expansion or improvement projects for the water distribution system and the wastewater collection system.

Find the Documents You Need






  1. Chris Snapp

    Chris Snapp, P.E.

    City Engineer & Director Municipal Development

  2. Engineering Department


    Physical Address
    201 E Nash Street
    Terrell, TX 75160

    Phone: 972-551-6600, ext. 8004
    Fax: 972-551-6682


Related Documents